Projects

Reference list, 1990 to today

ARIF has played a pivotal role in major national infrastructure: high-voltage transmission lines and substations, water and irrigation networks, large-scale industrial and energy developments, and oil and gas rehabilitation.

  1. 1990–1991

    90 km of 66 kV overhead transmission line — civil works, tower assembly, conductor stringing, commissioning and handover.

    Main contractor: A. Mohsen Zeneldin Contracting

    ClientPublic Establishment of Electricity (PEE)
  2. 1993–1994

    Supply and assembly of 2020 mm diameter pipes — civil works, pipe laying and welding, testing and commissioning.

    Main contractor: NOKSEL / SAFA Contracting

    ClientG.D. of Khabour Basin, Ministry of Irrigation
  3. 1993–1996

    Design and supply of 20/66/230/400 kV substation, supervision of erection, testing, commissioning and operation start-up.

    Main contractor: Mitsubishi Heavy Industry / Schneider Electric

    ClientJandar Power Generation Co., Ministry of Electricity
  4. 1995–1997

    Supply of 66 kV circuit breakers, 66 kV disconnecting switches and 20 kV circuit breakers.

    Main contractor: Schneider Electric / COELME

    ClientPEDEEE, Ministry of Electricity
  5. 1996–1999

    360 km 400 kV overhead transmission line, turnkey — design and supply of equipment, civil works, tower assembly, conductor stringing and commissioning.

    Main contractor: KEC, India

    ClientPEEGT, Ministry of Electricity
  6. 1997–1998

    Supply of 1520 mm diameter steel pipes.

    Main contractor: NOKSEL

    ClientMinistry of Housing, Syria
  7. 1997–1998

    Supply of 20 kV capacitor banks, training, commissioning and handover.

    Main contractor: RECTIPHASE / Schneider Electric

    ClientPEDEEE, Ministry of Electricity
  8. 1998

    Supply of high-voltage connectors and fittings.

    Main contractor: TYCO Electronics / SIMEL

    ClientPEEGT, Ministry of Electricity
  9. 1998–1999

    Supply of large diameter pipes for the cooling tower, and 420 mm pipes for the pumping station.

    Main contractor: Mitsubishi Heavy Industry / NOKSEL

    ClientAl Zara Power Station & Irrigation Project
  10. 1998–2002

    Complete electrical package supply (0.4 / 6.3 / 20 / 66 / 230 kV), supervision, commissioning and operation.

    Main contractor: Mitsubishi / Schneider Electric

    ClientAleppo Power Station, Ministry of Electricity
  11. 1999–2001

    Supply of complete electro-mechanical systems for 230/66/20 kV substation.

    Main contractor: Nuova Magrini Galileo

    ClientPEEGT, Ministry of Electricity
  12. 1999–2000

    Feasibility study for the Syrian high-voltage network monitoring and control center.

    Main contractor: EDF

    ClientPEEGT, Ministry of Electricity
  13. 1999–2002

    Steel structure erection, panel installation, covering and turbine housing.

    Main contractor: Mitsubishi Heavy Industry / T.O.E.C

    ClientAl Zara Generation Company
  14. 2001–2003

    Consultation for five 66 kV substations — quality control in China and installation supervision in Syria.

    Main contractor: EDF

    ClientPEDEEE, Ministry of Electricity
  15. 2002–2005

    Supply of 20 kV ring main units and six 66/20 kV mobile substations.

    Main contractor: Schneider Electric / Nuova Magrini Galileo

    ClientPEDEEE, Ministry of Electricity
  16. 2004–2006

    Optical fiber cable implementation project.

    Main contractor: Ericsson / T.O.E.C

    ClientMinistry of Telecommunications, Syria
  17. 2005–2007

    Installation of dry cooling tower, jet condenser, boilers, piping, transformers, electrical and instrumentation work.

    Main contractor: KOCH & Siemens Cons. / T.O.E.C

    ClientZezooun Combined Cycle Power Plant
  18. 2006–2012

    Complete design and construction of a 24,000 m² commercial building.

    Main contractor: ARIF Contracting

    ClientSyrian Company for Investment & Development
  19. 2009–2011

    Rehabilitation and upgrading of Tartous Cement Plant — structural, mechanical and electrical works.

    Main contractor: ARIF Contracting

    ClientPharaon Group, Ministry of Industry
  20. 2010–2012

    Manufacture and erection of steel tanks, piping, mechanical and electrical works.

    Main contractor: AES Contracting

    ClientLafarge Cement Plant, France
  21. 2016–2026

    Complete design and construction of three 16-floor residential buildings.

    Main contractor: ARIF Contracting

    ClientZeneldin Development

The founder's track record

Works of Dr. A. Mohsen Zeneldin, 1985 to today

  1. 1985–1987

    Director General — Syrian Networks (Syrianet)

    Responsible for executing more than 20,000 km of power transmission lines, alongside nationwide telecommunications infrastructure across Syria.

  2. 1987–2002

    Independent Consultant & Contractor

    Led consulting and construction projects across the energy, telecommunications and industrial sectors, including design, execution and maintenance of electrical and mechanical systems.

  3. 1993–1996

    Jandar Power Generation Plant

    Led the design, supply, erection and commissioning of the high-voltage equipment.

  4. 1995–1999

    Banias Refinery Rehabilitation

    Supervised the civil, mechanical and electrical rehabilitation works.

  5. 1999–2004

    Tartous Cement Plant Modernization

    Managed the modernization of the plant's critical industrial infrastructure.

  6. 1985–present

    Power Transmission & Electrical Systems

    Execution of large-scale substation and transmission line projects across Syria, and founder-chairman leadership of ARIF in HV substations, overhead lines and water infrastructure with world-class partners.